Menu

Track Your QSR Shipment

Online tracking available for Twinsburg-based accounts only. For other QSR locations, select below for more information.

Your QSR Account Number can be found on your invoices and packing slips in the format of "1234-56"

For order tracking in Jasper, GA, contact your QSR customer service representative:

Noel May
[email protected]
706-692-8603

For order tracking in DONGGUAN, CHINA, contact your QSR customer service representative:

Mary Zeng
[email protected]
(86) 769-83695990  Ext:189

For order tracking in Queretaro, Mexico, contact your QSR customer service representative:

Luis Mata
[email protected]
+52 1 442 363 6796

Close

Job Title:         Press Utility

Department:    Press Line

Author:            Chris Baggett

Date:               August 15, 1996

Revision:         February 11, 1998

 SUMMARY:

All the jobs of the material handler shall support the press line both directly and indirectly.

Everything he does will improve the value of the product manufactured.

ESSENTIAL DUTIES:

  • Supply material to the press line.
  • Move full pallets or direct ship to finishing.
  • Empty dumpsters.
  • Make boxes for the press line.
  • Take parts in tubs from press line to tumbling area.
  • Safe lift truck operation.
  • Log rubber in and out in cold room.
  • Inform supervisor of stock supply.
  • Complete assigned breaks as required.

NON-ESSENTIAL DUTIES:

  • Inform stock cutters of near-empty pallets on pre-cut material.
  • Go to lab to get tickets for rubber so he can bring the rubber to the line.

PHYSICAL REQUIREMENTS:

  • Be able to stand for eight hours per day.
  • Be able to climb on and off the lift truck 50 times a day.
  • Be able to lift tubs of parts weighing 50 lbs. each.
  • Use hand trucks to transport parts to finishing.
  • Be able to operate presses

TRAINING REQUIREMENTS:

Refer to Quality Training Matrix

 TOOL, EQUIPMENT, AND MATERIAL REQUIREMENTS:

  • Lift truck
  • Hand truck
  • Personal protective equipment

 SAFETY AND SECURITY REQUIREMENTS:

Follow plant safety rules